Double guide rail cargo lift realizes multi-point control and interactive interlocking of upper and lower floors to achieve safe use; The lifting height is high, and the side mounted oil cylinder or double measuring oil cylinder is adopted, with stable operation, no noise, convenient maintenance and long service life; Power off manual descent and emergency stop button, convenient, fast and practical; The pit depth is generally 15cm-30cm, and the height of the top layer is not limited, which can be customized according to the site environment; The landing door can pass through, and the inside and outside of the plant can be poked open each other, which is convenient and saves space; It is especially suitable for 2-3 floors of steel structure plants, both inside and outside; The pump station is an imported pump station. If the speed requirement is too high, the imported customized pump station is adopted to meet the ideal delivery requirements. The oil cylinder and seals are imported parts to solve the problem of unstable oil pressure and oil leakage of parts. The electrical parts are optional. Hydraulic Warehouse Cargo Lifts,Customized Cargo Lift,Double Guide Rail Cargo Lift,Four Post Platform Cargo Lift zhongcan machinery Co.,Ltd , https://www.zclift.com
Description:
SS304 Pan Head Socket Cap Screw with Washer
Dimension:
We make all standard sizes and non-standard sizes.
Sample Fee:
Samples of <10 pcs will be free,you need to pay for the shipping fee.
Sample Time:
For standard fasteners,the sample time will be about 2~3 days;
For non-standard fasteners,the sample time will be about 5~7 days.
Lead Time:
For standard fasteners,the lead time will be about 7~10 days;
For non-standard fasteners,the lead time will be about 10~15 days.
Item Details:
Â